BELFOR restored 16 contaminated PLC and supply panels and a critical heat recovery wheel at a manufacturing plant in Selangor, Malaysia. Following specialist decontamination, all panels were successfully re-energised on 10 April 2026, allowing the manufacturer to return critical production equipment to reliable operation.

Corrosive contamination put production control systems at risk

The plant manufactures decorative surface materials using production lines controlled by programmable logic controller (PLC) panels. Testing identified corrosive residues on components inside the panels, while parts of the panel frames already showed visible signs of corrosion.

Corrosive contamination put production control systems at risk

Sticky, acidic soot had also contaminated the face and narrow honeycomb structure of the plant’s heat recovery wheel. Residues left inside the structure could have caused imbalance, further corrosion or electrical faults when the drive motor was restarted.

Targeted testing defined the industrial electronics recovery scope

Following an inspection on 27 February 2026, BELFOR Malaysia carried out the decontamination work from 30 March to 10 April. Initial testing identified which components required specialist treatment and helped define the appropriate recovery process.

Targeted testing defined the industrial electronics recovery scope

Technicians dismantled 108 affected components for precision cleaning at BELFOR’s workshop. Fixed installations, panel frames and mounting hardware were decontaminated on site.

The recovery process included specialist cleaning, controlled drying and heating, restoration of corroded panel frames and electrical testing before re-energisation.

All 16 panels successfully returned to Operation

BELFOR also isolated and decontaminated the heat recovery wheel, including its internal structure. Careful drying and controlled heating prepared the equipment for restart.

All 16 panels successfully returned to Operation

BELFOR reassembled all 16 panels in their original configuration and successfully re-energised them on 10 April 2026.

During recommissioning, BELFOR worked alongside the equipment manufacturer’s technicians to check drives, wiring and programming. Two faulty drives identified during the process were replaced.

The manufacturer subsequently confirmed that all sensors, hardware and software were fully operational and performing within nominal design specifications.

For industrial companies, insurers and loss adjusters, the project shows how specialist equipment recovery can preserve critical assets while providing a controlled and technically verified route back to operation.