Industrial Decontamination of a Metal Processing Facility in Malaysia

BELFOR Malaysia completed the industrial decontamination of six production machines, a baghouse dust collection system and extensive warehouse areas at a metal processing facility in Malaysia.


Delivered in two phases and completed in under four weeks of on-site work, the project removed fine particulate contamination from machinery and production areas while ensuring contaminated waste was safely disposed of.
Fine particulate contamination affected machinery and production areas
The facility uses shredding, granulating, milling and sampling equipment to process materials across a large production warehouse. Fine particulate contamination had accumulated on production machinery and throughout the surrounding environment, including high-level walls, roller shutters and floors.


Several machines have enclosed areas with internal walls and ceilings where dust can settle. The facility’s baghouse dust collection system also contained 96 contaminated filter bags that needed to be removed and disposed of as scheduled waste.
A two-phase industrial decontamination Programme
BELFOR structured the project in two phases. During the first three days, technicians cleaned accessible external machine surfaces and the surrounding floor. Loose materials were cleaned, wrapped and removed from the work area before being returned to the customer.


The second phase covered comprehensive decontamination of the shredder, auto sampler, 50 HP granulator, splitter, V blender and ball mill. BELFOR also cleaned the baghouse and filter cages, high-level walls, roller shutters and warehouse floors.


Specialist access equipment enabled the team to safely reach elevated areas. Contaminated filter bags and other affected materials were removed through a licensed waste contractor. Air quality and health risk testing supported a safe working environment throughout the project.
Industrial decontamination completed in under four weeks
BELFOR completed both phases in under four weeks of on-site work. All six machines and the agreed production areas were decontaminated, while contaminated waste was disposed of in line with scheduled waste requirements.


Each project phase was jointly inspected with the facility’s authorised representative and formally confirmed as complete and satisfactory.