BELFOR Europe / Resources / Success stories / Duesseldorf Airport fire restoration: Terminal C back in operation after just seven months

Duesseldorf Airport fire restoration: Terminal C back in operation after just seven months

Case study from the archive · First published in 1996

Large scale devastation

Following the devastating fire at Duesseldorf Airport in 1996, BELFOR Germany mobilised a 35-strong expert team within three hours of the loss notification. Working around the clock, up to 450 specialists helped restore critical infrastructure, equipment and Terminal C. On 1 November 1996, just seven months after the disaster, the terminal returned to operation.

Rapid fire restoration helped minimise operational downtime

On 11 April 1996, welding work caused a major fire at Duesseldorf Airport. Seventeen people lost their lives and 80 were injured, some seriously. Terminal A was destroyed, while intense heat caused extensive damage across other parts of the airport.

Fire residues containing highly toxic dioxins and hazardous materials including asbestos, PCB and PAH created an additional restoration challenge. Germany’s second-largest airport came to a standstill.

Getting essential airport operations running again required immediate, carefully coordinated action.

Affected Areas

BELFOR specialists were on site within three hours

Only three hours after the insurance claim was reported, 35 BELFOR experts arrived to assess the damage and develop an initial restoration approach based on findings from chemical specialists.

Comprehensive work started the following day. Operating in three shifts with a total workforce of 450, BELFOR initially prioritised infrastructure essential to resuming flight operations, including passenger boarding bridges, the control tower and weather station.

Large-scale restoration covered infrastructure, IT and airport operations

The programme then expanded to Terminal C. Fire-affected areas were stripped out, non-restorable materials removed and contaminated building surfaces thoroughly cleaned.

The extensive scope included check-in counters, baggage handling systems, customs facilities, security gates, flight information monitors, escalators, bus gates, shops, lounges and offices. BELFOR also restored technical equipment and infrastructure, IT systems, documents and records.

Terminal C reopened only 234 days after the fire

The coordinated restoration enabled Terminal C to reopen on 1 November 1996, 234 days after the disaster. The project demonstrates how rapid mobilisation, contamination management and large-scale technical restoration can protect business continuity and accelerate recovery following a major property loss.

The place:

The cause of the damage:

Fire – triggered by welding work

Services provided by BELFOR:

Large-scale restoration of Terminal C: check-in desk area with luggage handover/labelling belts and luggage scales, baggage reclaim with luggage belts, customs cubicles, staff security points, arrival and departure information monitors, the tower including tower technology, airbridges, bus gates, weather station, escalators and travelators, underground supply channels (control technology, energy, communications), customs areas with evidence rooms, offices, shopping area, lounges, complete IT restoration in Terminal A, documents and folders, establishment of a container city, provision of all external power supplies, including refuelling services.