UPS Room Fire Restoration Completed in Under Three Weeks


BELFOR Malaysia restored the affected areas of a major international bank in Malaysia in under three weeks after a fire in its uninterruptible power supply (UPS) room. The response combined safe disposal of damaged equipment with specialist decontamination of the UPS room, ventilation system and surrounding offices.
Fire contamination spread beyond the UPS room
The fire damaged battery racks, lead-acid UPS batteries, electrical distribution equipment, supply cables and two air-conditioning units. Heavy soot contaminated the walls, ceiling and raised floor inside the UPS room.


The impact extended beyond the immediate fire area. Smoke and soot entered two air handling units and travelled through the connected ductwork into nearby offices and meeting rooms. Indoor air quality testing near the UPS room recorded particulate levels above the specified limit of 0.15 mg/m³.


Without specialist treatment, acidic soot and chloride residues could have caused further corrosion to metal surfaces, electrical components and technical equipment.
BELFOR combined safe disposal with specialist fire decontamination
BELFOR Malaysia carried out the restoration work between 23 May and 10 June 2026. Before dismantling began, specialists isolated the UPS system from the building’s power supply.
Damaged batteries and electrical equipment were then removed through a protected transport route and sent to a licensed disposal facility.

Inside the UPS room, BELFOR contained the affected area to prevent secondary contamination. Non-restorable walls and ceilings were removed, while the floor and sub-floor areas were thoroughly cleaned and dried in preparation for reinstatement.
Ventilation decontamination reduced the risk of recontamination
A key part of the restoration was preventing residual contamination from continuing to circulate through the building.


BELFOR decontaminated both air handling units, the heat recovery wheel and connected ductwork. Specialists also cleaned affected IT equipment, furniture, ceilings, windows and glass partitions. Electrical safety checks were carried out before equipment was reconnected, while contaminated carpets were removed because they could retain ash and smoke particles.
The affected areas were handed back ready for reinstatement
Within less than three weeks, BELFOR had safely removed the damaged UPS equipment and decontaminated the technical systems and affected office areas.


The UPS room was handed back ready for renovation, and the bank formally confirmed that BELFOR’s services had been completed satisfactorily.